Integrated Design + Build

Traditional Delivery Method. With a Twist. With the traditional Design-Build delivery method, the Project Owner contracts with the general contractor,...

Tucson Botanical Gardens 2015

For this project, the building was designed with a variety of materials including clay adobe, stone cladding, and architectural features made from met...

Truly Nolen Corporate Headquarters

Lloyd Construction was the Contractor and Architect for this marquee project in midtown Tucson. New construction includes the building of a 12,000 SF...

TMC Cooling Tower

Lloyd Construction partnered with Tucson Medical Center and the Architect to replace (3) existing cooling towers with (2) new, modern towers at the ho...

University of Arizona Intercollegiate Athletics Facility

Lloyd Constructed this new 43,150 SF indoor practice gymnasium for the University of Arizona Wildcats. The project also included an expansion of the e...

Oro Valley Aquatic Center, Town of Oro Valley

The existing deck on the 50-meter pool was raised by two feet to provide additional pool depth required to hold sanctioned national swim meets. A comp...

Quincie Douglas Pool, City of Tucson

Lloyd partnered with the City of Tucson and the Architect to build an outdoor swimming pool facility at the existing Quincie Douglas Neighborhood Cent...

The Ritz-Carlton, Dove Mountain- Clubhouse Village

Lloyd Construction partnered with the Architect and Owner to build the Clubhouse Village at the new Ritz-Carlton at Dove Mountain. The clubhouse inclu...

390th Memorial Museum

Lloyd completed a renovation of the 390th Memorial Museum located at the Pima Air & Space Museum in Tucson. The museum is dedicated to the 390th B...

Vail Academy and High School

This project is a new charter school for 450 students from kindergarten through high school. The school includes a multipurpose room with stage and ki...